香港天主教教區建築及發展委員會
小組目的 職務指引 職務內容 發展路向 組織架構 工程項目 教區連結 [回主頁]
中期報告(2003年六月)
1. New Works (新項目)
1.1 New Church Site at Tung Chung
1.2 Construction of the St. Andrew's Church, Tseung Kwan O
1.3 Construction of the Extension to the St. Raphael Cemetery at Chueng Sha Wan
2. Major Improvement (改善項目)
2.1 Rosary Church, Tsim Sha Tsui
2.2 St. Jude's Church, North Point
2.3 St. Alfred's Church, Tai Wai
2.4 St. Peter's Church, Aberdeen
2.5 Shek O Retreat House, Shek O
2.6 St. Francis of Assisi Church, Sham Shui Po
2.7 Cathedral
3. Planned Works (籌劃項目)
3.1 Lift Installation to St. Stephen's Church, Ha Kwai Chung
3.2 Resurrection Church, Kung Tong
3.3 Tai Shek Street Office Building
3.4 St. Joseph's Church (Garden Road)
3.5 St. Anne's Church, Stanley
3.6 Holy Spirit Seminary "(HSS)", Aberdeen
3.7 Ossuaries at the Cathedral
3.8 survey on existing A/C system for all churches
3.9 Publication of "Church Tour" Pamphlets
3.10 Assist the Hong Kong Institute of Architecture in "Century Architecture" publication
4. Works Completed Recently (完成項目)
4.1 Annunciation Church, Tsuen Wan
4.2 CCTV Investigation for St. Joseph's Church (Garden Road) and at Wo Mei (Sai Kung)
4.3 Xavier House, Cheung Chau
5. Other on-going projects include the following: (其他項目)
5.1 Management Information System (MIS) for the Diocese
5.2 Study on the utilization of the existing parish facilities in relation to their service to meet the needs of the local community at St. Margaret's Church, Holy Cross Church, Star of the Sea Church and Resurrection Church
5.3 DBDC Website
5.4 Updating the listing of consultants and contractors
5.5 Updating the appraisal system to assess the performance of consultants and contractors
5.6 Reviewing DBDC standard forms and letters
5.7 Reviewing DBDC contractor payment app;ication procedures to facilitate payment approval system
5.8 Reviewing DBDC work pattern to enforce a better control over procedural matters
5.9 Assist the Catholic Board of Education in the taking over of SIP schools
5.10 Assist Parishes in the defects rectification works within the Defect Liability Period (DLP)
5.11 Assist Parishes to set up a Maintenance team to take over the maintenance work after the expiry of DLP
6. Award Received (賞譽)
6.1 The interior design of Our Lady of Mount Carmel Church, Wanchai, was awarded a "Mention" by the Asia-Pacific Space Designer Association
6.2 The interior design of Our Lady of Mount Carmel Church, Wanchai, was awarded a lighting design prize
6.3 Awaiting the result of our submission (to be announced in Sept 2003) of The Cathedral Renovation Project to the United Nations Educational Scientific and Culture Organization for the "UNESCO ASIA-PACIFIC HERITAGE AWARDS ─ For Culture Heritage Conservation"